Case Study
Case Study: SpringHill Suites

We invite you to go behind the scenes of SpringHill Suites, a recent hotel construction project in historic Frederick, Maryland Md. The project started in the spring of 2020 and features 75,000 square feet of space that includes six stories and 118 rooms.

In this short video, you’ll learn about Iron Engineering’s involvement, including:

  • How we revised the design and completed the entire cold-formed steel framing for the building
  • Challenges we encountered during the project
  • The cost savings we provided through our cold-formed steel design expertise
  • Why cold-formed steel was the ideal material choice
  • And much more!
Download Case Study
  • This field is for validation purposes and should be left unchanged.